Create Support Request

Elite Paint & Chemical Industries Ltd. – HVAC & Fire Hydrant Pipe Line Dismantling & Installation

Elite Paint & Chemical Industries Ltd. – HVAC & Fire Hydrant Pipe Line Dismantling & Installation

Project Information

  • Client:
  • Location:
  • Category:
  • Completion Date:
  • Status: Completed ✅

Elite Paint & Chemical Industries Ltd Project | HVAC & Fire Hydrant Pipe Line Installation in Dhaka | Bhai Bhai Engineering

 

1. Project Overview:

Bhai Bhai Engineering takes pride in completing a major industrial project for Elite Paint & Chemical Industries Ltd., headquartered at Mika Cornerstone (5th & 6th floor), Plot#16/17, Road#12, Sector#06, Uttara, Dhaka.
The scope of work included HVAC (Heating, Ventilation & Air Conditioning) and Fire Hydrant Pipe Line Dismantling & Installation — two critical systems for industrial and commercial infrastructure.

Our experienced engineers dismantled the existing system safely, upgraded components to meet the latest industrial standards, and installed high-efficiency HVAC and fire safety pipelines. The result: improved energy performance, better air circulation, and reliable fire protection for the facility.


 

2. What is HVAC & Fire Hydrant Pipe Line Dismantling & Installation?

This type of work involves removing old HVAC and fire hydrant systems and installing new or upgraded units and pipelines to ensure better air quality, temperature control, and fire safety.

  • HVAC Installation ensures proper heating, cooling, and ventilation in commercial and industrial environments.

  • Fire Hydrant Pipe Line Installation ensures a ready water supply and pressure system for firefighting during emergencies.

These are vital for buildings like factories, warehouses, offices, and large facilities that require continuous comfort and safety standards.


 

3. Importance of HVAC & Fire Hydrant Pipe Line Dismantling & Installation:

  • Ensures safe and efficient air circulation across the building.

  • Reduces energy consumption with modern HVAC technology.

  • Prevents fire hazards by maintaining a functional hydrant system.

  • Enhances building compliance with Bangladesh National Building Code (BNBC).

  • Improves working conditions and safety standards.

  • Increases the overall value and sustainability of industrial facilities.

Elite Paint & Chemical Industries Ltd. – HVAC & Fire Hydrant Pipe Line Dismantling & Installation

Regular upgrading and installation of HVAC and fire hydrant pipelines are essential for the long-term safety and efficiency of any modern facility.


 

4. HVAC & Fire Hydrant Pipe Line Price in Bangladesh:

The cost of HVAC and fire hydrant pipe installation in Bangladesh depends on the project size, materials, and brand of equipment used.

  • HVAC Dismantling & Installation, Fire Hydrant Pipe Line Installation, For an accurate estimate, contact Bhai Bhai Engineering for a site inspection and customized quotation.


 

5. Why Choose Bhai Bhai Engineering?

  • Experienced Engineers & Certified Technicians

  • Complete HVAC & Fire Protection Solutions Under One Roof

  • Safe Dismantling and Professional Installation Process

  • On-Time Project Completion with Quality Assurance

  • Competitive Pricing for Industrial and Commercial Clients

  • Nationwide Service Coverage across Bangladesh

  • After-Sales Maintenance & Technical Support

We don’t just install — we ensure your systems perform efficiently and safely for years.


 

6. Call Us for HVAC & Fire Hydrant Pipe Line Installation:

Looking for a professional HVAC and Fire Hydrant contractor in Bangladesh?
Call Bhai Bhai Engineering today at  +880 1722-039029 or email us for a free on-site consultation.

We supply, dismantle, and install complete HVAC and firefighting systems for factories, corporate buildings, and industrial facilities with professional-grade precision.


 

 

7. FAQ – HVAC & Fire Hydrant Pipe Line Dismantling & Installation in Bangladesh

Q1: What types of HVAC systems do you install?
We install split-type, packaged, ducted, VRF/VRV, and central air conditioning systems for commercial and industrial use.

Q2: Do you provide both supply and installation services?
Yes, Bhai Bhai Engineering provides complete turnkey solutions — from equipment supply to installation and testing.

Q3: Can you upgrade existing fire hydrant systems?
Absolutely. We dismantle outdated hydrant pipelines and replace them with modern, code-compliant fire safety systems.

Q4: Do you provide maintenance services after installation?
Yes, we offer annual maintenance contracts (AMC) to ensure system longevity and efficiency.

Q5: How long does such a project take?
Project duration varies based on size and complexity, typically 2 to 8 weeks for medium to large-scale setups.

ফোনে সরাসরি কল দিন

WhatsApp এ কল দিন