Create Support Request

Project Information

  • Prime Minister's Office of Bangladesh Prime Minister's Office of Bangladesh
  • Work Type: Central AC Pipe Jacketing (ICC Building, Room 135) and Canteen Exhaust System
  • Location: Old Parliament Building, Tejgaon, Dhaka-1215, Bangladesh
  • Project Start Date: June 12, 2026
  • Status: Running ✅

Central AC, Pipe Jacketing & Exhaust System Installation at Prime Minister's Office

Central AC Pipe Jacketing (ICC Building, Room 135): Implementation of professional thermal insulation jacketing to minimize heat loss, prevent condensation, and ensure the longevity of the chilled water piping network.

Kitchen Exhaust System (PMO Canteen): Installation of a heavy-duty, industrial-grade grease extraction and ventilation system to maintain air quality and fire safety standards in a high-intensity culinary environment.

Hot Kitchen Duct Cleaning System: Installation Manual (Summary)

  1. Assessment: Inspect duct layout and grease accumulation levels.

  2. Safety Lockout: Disconnect all electrical/gas supplies to the canteen.

  3. Containment: Seal off kitchen equipment with heavy-duty protective sheeting.

  4. Degreasing: Apply industry-grade emulsifiers to break down stubborn grease.

  5. Manual/Mechanical Scouring: Use specialized brushes and scrapers for deep cleaning.

  6. Inspection & Certification: Final verification of airflow and fire safety compliance.

Importance of HVAC Systems in Bangladesh

  • Government Sector: Essential for critical infrastructure (like the PMO) to maintain productivity, protect sensitive electronic equipment from humidity, and ensure the safety of high-occupancy areas.

  • Non-Government/Corporate: Crucial for energy efficiency—modern jacketing can reduce electricity consumption by up to 30%, while proper exhaust systems prevent fire hazards and ensure compliance with building codes.

Central AC Pipe Jacketing & Exhaust System Price in Bangladesh

Bhai Bhai Engineering offers the most competitive pricing in Bangladesh by optimizing material procurement and utilizing local engineering expertise without compromising on international quality standards (ISO/ASHRAE). We provide transparent cost structures that maximize your ROI.

Central AC Pipe Jacketing & Exhaust System Installation Cost

The cost for kitchen duct cleaning and installation varies based on the duct length, accessibility, and the level of grease buildup. Bhai Bhai Engineering offers a customized site assessment to provide an accurate, no-obligation quotation tailored to your specific kitchen layout.

Why Choose Bhai Bhai Engineering?

  • Expertise: We specialize in high-security, high-priority projects.

  • Compliance: All installations follow NFPA 96 and local safety standards.

  • Technical Excellence: Our team uses advanced thermal insulation materials for superior pipe durability.

  • Reliability: We prioritize the strict timelines and security protocols of government facilities.

Get Quick Quotation

Need a professional HVAC solution for your facility?

Contact us today for a free site consultation.

  • Phone: 01722039029

  • Email: bhaibhaiengineering51@gmail.com

  • Website: www.bhaibhaiengineering.com

Frequently Asked & Question about Central AC Pipe Jacketing & Exhaust System

Question: Why is pipe jacketing necessary for Central AC systems?

Answer: It prevents condensation (which causes water damage) and significantly reduces energy loss, keeping your cooling costs low.

Question: How often should kitchen exhaust systems be cleaned?

Answer: In high-use commercial kitchens, we recommend cleaning every 3–6 months to prevent grease-related fire hazards.

Question: Do you provide services outside of Dhaka?

Answer: Yes, Bhai Bhai Engineering provides specialized HVAC solutions across all major districts in Bangladesh.

ফোনে সরাসরি কল দিন

WhatsApp এ কল দিন